SIDE BY SIDE

The four cables compared

CAT6 Flat — 4 PairCAT6 Flat — 4 Pair + GI RopeCAT6 Flat — 2 Pair (intercom)2+2 Flat — HD camera
UseIP camera in the carIP camera, tall / heavy-duty shaftIntercom, emergency phoneHD / analog camera
Part codeCC-8251G-90CC-8261G-90CC-4251G-90CC-9511K-90
Cores4 twisted pairs4 twisted pairs + 2 GI ropes2 twisted pairs2 video + 2 power
Conductor24 AWG stranded copper (7/0.195 mm)Multi-strand copper (as CC-8251G)Multi-strand copperTinned-copper video, copper power
JacketFlexible FRLS PVC, greyFlexible FRLS PVC, greySoft-grade FRLS PVC, greyFlexible FRLS PVC, black
Profile12 × 5 mm flatFlat, with messengersFlatFlat
Carries power?PoE on the data pairsPoE on the data pairsNo12 V DC on the power cores
Recommended runUp to 60 m (IP camera on PoE)Up to 60 m (IP camera on PoE)Voice — loop lengthLoop length; check 12 V drop
Fire performanceFRLS, IEC 60332-1FRLSFRLSFRLS
Packing90 m coil pairs90 m coil pairs90 m coil pairs90 m coil pairs
DatasheetTDS CT/TDS/01 (download)On requestOn requestOn request

Values for CC-8251G-90 are from datasheet CT/TDS/01; the other three follow the Channeltech catalogue, with full datasheets issued on request.

CHOOSE

Not sure which? Three questions and the coil count.

Answer what is in the car and how tall the shaft is; then put in the travel height and we size the job in 90 m coil pairs.

1 · WHAT IS IN THE LIFT CAR?
3 · SIZE THE JOB
Mid-shaft: loop ≈ travel ÷ 2 + 3 m. Shaft top: loop ≈ travel + 3 m. Plus 10 % slack, rounded up to 90 m coil pairs. How the sums work →
RESULT

Pick what is in the car to get the part code.

QUESTIONS

Choosing — questions

How do I know if the lift camera is IP or HD?

If the camera connects to an NVR with an RJ45 plug it is IP. If it connects to a DVR with a BNC connector it is HD or analog. The camera's label usually says IP / PoE, or HD-TVI / AHD / CVI.

What travel height do I enter?

The distance the car travels from the lowest to the highest landing, not the building height. The lift company has it on the drawing; roughly 3 m per floor for residential buildings.

Why 90 m coil pairs?

Lift jobs consume cable in pairs — two lifts in a bank, or a run and its spare — so Channeltech supplies matched 90 m + 90 m coils. One pair typically serves two lifts.